21 results in the forums
Order by date - Order by pertinence
All (24)
Press (1)
High-tech (21)
Forums (2)
 
Lost the PERT COM add-in and need it back
I was getting errors when working with the PERT and tried to fix the problem. I accessed the COM list and removed the PERT chart Add-in, and now I can't get it back. Help doesn't help, searching I couldn't find the answer, and uninstalling / ...
Message posted on the February 20th, 2010 - 9:48 PM ET
PERT Analysis
Running Project Server 2007 with SP1. Are the PERT Analysis fields available for creating a custom view on PWA? I am notable to locate them. I would like to extend a PERT Analysis into PWA for viewing purposes.
Message posted on the May 28th, 2009 - 03:39 pm ET
Pert Analysis
Hi, I cannot make the Pert Analysis work on my computer. I have set the toolbar up. If I click on the buttons, nothing happens. I checked the Com add ins and tried to add the Pert dll and I cannot add it neither.I have the following add ins: Office ...
Message posted on the March 19th, 2009 - 06:03 pm ET
Pert Chart
Where can I find a step by step instruction to creating a Pert Chart in MS Project?
Message posted on the February 22nd, 2010 - 01:50 pm ET
PERT/CPM/ANALYSI
Hi, I have a problem locating any analytical methods on my MSP 2007 that I just installed yesterday. Could someone help me where else I could locate PERT/CPM and all the other analytic methods in Project? When I go to VIEW-TOOLBAR, all I get are: ...
Message posted on the September 27th, 2009 - 09:47 am ET
Reading border shape in Pert view
I'm using the BoxFormat method in a MSProject 2003 macro to set the appearance of tasks in a Pert view. Before overwriting old information I would like to find out what border shape and colour the task has. I can not find a property giving me that ...
Message posted on the August 24th, 2009 - 05:49 am ET
Convert Gantt to PERT
I am about to develop a project plan, and will likely make the first pass a Gantt Chart. Later, if I decide that I would rather have it in PERT format, will Visio do the "translation", or must I start all over?
Message posted on the March 07th, 2009 - 01:14 pm ET
How to Locate PERT/CPM/ANALYSIS ON TOOLBAR
Hi, I am unable to locate these features in my newly installed MP. When I go to view, the toolbar, they are missing. Is there any other way I could find them in my newly installed Project 2007? Thanks a lot! EAO
Message posted on the September 27th, 2009 - 09:30 am ET
[RFC/RFT PATCH] sched: automated per tty task groups
Greetings, Comments, suggestions etc highly welcome. This patch implements an idea from Linus, to automatically create task groups per tty, to improve desktop interactivity under hefty load such as kbuild. The feature is enabled from boot by ...
Message posted on the October 19th, 2010 - 05:20 am ET
Busy looping iwl3945 driver
Hi Today I've noticed 100% CPU occupied by kworker thread - which appeared to be the result of some iwl3945 driver interaction. Here are some trace of some tasks from that moment. It looked like when I've then even tried to run 'mc' of ...
Message posted on the December 01st, 2011 - 05:40 am ET
OT Monday Humour Reprise
A woman undresses in front of her husband. 'Do you love me for my pert boobs, my tight pussy, my firm arse or my long legs' she asks him. 'No darling, I love you for your sense of humour' he replies.
Message posted on the May 24th, 2010 - 05:25 pm ET
Adding Additional Work to MS Project 2003
I would like to do some what-if analysis on my project schedule and am not sure how I can easily add say 30% additional work across the board on my project to show some best and worse case scenarios. Would I have to use a PERT chart to do this sort ...
Message posted on the May 19th, 2010 - 09:45 am ET
Pessimistic Duration field
I see this in the help file. How can I view this field? If I select insert column, I cannot find the Pessimistic Duration field. thanks Pessimistic Duration (task field) The Pessimistic Duration field contains the worst-case possibility for the ...
Message posted on the April 14th, 2010 - 11:41 pm ET
probability that project will we finished two days before planed day in project
Hello, I'm trying to find out where Microsoft Project 2007 shows probability or variance for critical task. For eg. I would like to know what is probability that project will be finished on 15 december (planed date is 17 dec). I have calculated PERT ...
Message posted on the December 09th, 2009 - 03:02 am ET